---
title: "Changing Monomial Order"
canonical: "https://docs.magma-maths.org/v2.30-1/CommutativeAlgebra/GrobnerBases/change-order.html"
source: "https://docs.magma-maths.org/v2.30-1/CommutativeAlgebra/GrobnerBases/change-order.md"
part: "Commutative Algebra"
chapter: "Gröbner Bases"
breadcrumbs:
  - {"title": "Magma Handbook", "source": "https://docs.magma-maths.org/v2.30-1/index.md"}
  - {"title": "Commutative Algebra", "source": "https://docs.magma-maths.org/v2.30-1/CommutativeAlgebra/index-commutative-algebra.md"}
  - {"title": "Gröbner Bases", "source": "https://docs.magma-maths.org/v2.30-1/CommutativeAlgebra/GrobnerBases/index-grobner-bases.md"}
prev: {"title": "Changing Coefficient Ring", "source": "https://docs.magma-maths.org/v2.30-1/CommutativeAlgebra/GrobnerBases/change-ring.md"}
next: {"title": "Hilbert-driven Gröbner Basis Construction", "source": "https://docs.magma-maths.org/v2.30-1/CommutativeAlgebra/GrobnerBases/hilbert-groebner.md"}
intrinsics:
  - {"name": "ChangeOrder", "signature": "ChangeOrder(I, Q): RngMPol, RngMPol -> RngMPol, Map"}
  - {"name": "ChangeOrder", "signature": "ChangeOrder(I, order): RngMPol, ... -> RngMPol, Map"}
  - {"name": "ChangeOrder", "signature": "ChangeOrder(I, T): RngMPol, Tup -> RngMPol"}
examples:
  - "ex-6f12cc"
---

# Changing Monomial Order

Often one wishes to change the monomial order of an ideal. Magma allows one to do this by use of the `ChangeOrder` function.

<a id="function-gb-changeorder"></a>
## `ChangeOrder(I, Q): RngMPol, RngMPol -> RngMPol, Map`

Given an ideal $I$ of the polynomial ring $P = R[x_1, \ldots, x_n]$, together with a polynomial ring $Q$ of rank $n$ (with possibly a different order to that of $P$), return the ideal $J$ of $Q$ corresponding to $I$ and the isomorphism $f$ from $P$ to $Q$. The map $f$ simply maps $P.i$ to $Q.i$ for each $i$.

The point of the function is that one can change the order on monomials of $I$ to be that of $Q$. When a Gröbner basis of $J$ is needed to be calculated, Magma uses a conversion algorithm starting from a Gröbner basis of $I$ if possible—this usually makes order conversion much more efficient than by computing a Gröbner basis of $J$ from scratch.

<a id="function-changeorder-rngmpol"></a>
## `ChangeOrder(I, order): RngMPol, ... -> RngMPol, Map`

Given an ideal $I$ of the polynomial ring $P = R[x_1, \ldots, x_n]$, together with a monomial order order (see Section [Representation and Monomial Orders](https://docs.magma-maths.org/v2.30-1/CommutativeAlgebra/GrobnerBases/order.md#dpoly-monomial-orders)), construct the polynomial ring $Q = R[x_1, \ldots, x_n]$ with order order, and then return the ideal $J$ of $Q$ corresponding to $I$ and the isomorphism $f$ from $P$ to $Q$. See the section on monomial orders for the valid values for the argument order. The map $f$ simply maps $P.i$ to $Q.i$ for each $i$.

<a id="function-gb-changeordertup"></a>
## `ChangeOrder(I, T): RngMPol, Tup -> RngMPol`

Given an ideal $I$ of the polynomial ring $P = R[x_1, \ldots, x_n]$, together with a tuple $T$, construct the polynomial ring $Q = R[x_1, \ldots, x_n]$ with the monomial order given by the tuple $T$ on the monomials, and then return the ideal $J$ of $Q$ corresponding to $I$ and the isomorphism $f$ from $P$ to $Q$. $T$ must be a tuple whose components match the valid arguments for the monomial orders in Section [Representation and Monomial Orders](https://docs.magma-maths.org/v2.30-1/CommutativeAlgebra/GrobnerBases/order.md#dpoly-monomial-orders) (or a tuple returned by the function [`MonomialOrder`](https://docs.magma-maths.org/v2.30-1/CommutativeAlgebra/GrobnerBases/creation.md#function-gb-monomialorder)).

<a id="example-ex-6f12cc"></a>
## `Example: Univariate Generators by Change of Order (ex-6f12cc)`

We write a function `univgen` which, given a zero-dimensional ideal defined over a field, computes the univariate elimination ideal generator for a particular variable by changing order to the appropriate univariate order. Note that this function is the same as (and is in fact implemented in exactly the same way as) the intrinsic function `UnivariateEliminationIdealGenerator`. We then find the appropriate univariate polynomials for a particular ideal.

```magma
> function univgen(I, i)
>    // Make sure I has a Groebner basis so that
>    // the conversion algorithm will be used when
>    // constructing a Groebner basis of J
>    Groebner(I);
>    J := ChangeOrder(I, "univ", i);
>    Groebner(J);
>    return rep{f: f in Basis(J) | IsUnivariate(f, i)};
> end function;
>
> P<x, y, z> := PolynomialRing(RationalField(), 3, "grevlex");
> I := ideal<P |
>     1 - x + x*y^2 - x*z^2,
>     1 - y + y*x^2 + y*z^2,
>     1 - z - z*x^2 + z*y^2 >;
>
> univgen(I, 1);
x^21 - x^20 - 2*x^19 + 4*x^18 - 5/2*x^17 - 5/2*x^16 + 4*x^15 -
    15/2*x^14 + 129/16*x^13 + 11/16*x^12 - 103/8*x^11 +
    131/8*x^10 - 49/16*x^9 - 171/16*x^8 + 12*x^7 - 3*x^6 -
    29/8*x^5 + 15/4*x^4 - 17/16*x^3 - 5/16*x^2 + 5/16*x - 1/16
> univgen(I, 2);
y^14 - y^13 - 13/2*y^12 + 8*y^11 + 53/4*y^10 - 97/4*y^9 -
    45/8*y^8 + 33*y^7 - 25/2*y^6 - 18*y^5 + 107/8*y^4 + 5/8*y^3 -
    27/8*y^2 + 9/8*y - 1/8
> univgen(I, 3);
z^21 - z^20 - 2*z^19 + 4*z^18 - 5/2*z^17 - 5/2*z^16 + 4*z^15 -
    15/2*z^14 + 129/16*z^13 + 11/16*z^12 - 103/8*z^11 +
    131/8*z^10 - 49/16*z^9 - 171/16*z^8 + 12*z^7 - 3*z^6 -
    29/8*z^5 + 15/4*z^4 - 17/16*z^3 - 5/16*z^2 + 5/16*z - 1/16
```
